A 3500Kg/hr Oil Fired steam Boiler operating at 10 Barg installed with all steam pipework, oil lines, electrical supplies, blowdown systems and safety interlocks to customers specification.
The tight deadline required the removal of the existing boiler and installation of the new within the factory 9 day shutdown in order to resume production.